B20 FACTORY//EARLY ACCESS SPOTS 0000/2000
DWG NO. B20-EA-01 SHEET 1/1 SCALE 1:1 REV. A

B20 FACTORY

The production line opens soon. Run the checklist below — operators who clear every step claim a numbered spot in BATCH 01.

B20 B20 B20 B20 MINT HALL DRIVE OUT PRODUCTION FLOOR
FIG. 01 — PRODUCTION LINE / BATCH 01
  1. 01IDENTITY
  2. 02TASKS
  3. 03CLAIM
STEP 01 IDENTITY LOCKED

Your X handle. Every task below is matched against it when spots are verified.

@
STEP 02 TASKS LOCKED

Four checks on X. Each one unlocks the next — clear all four to open the claim window.

    STEP 03 CLAIM SPOT LOCKED

    Paste the wallet that will receive your allocation. No connect, no signatures — just the address.

    0x